Toxic (Chinese) Drywall Abatement
Increasing evidence indicates that some of the over 500 million pounds of drywall shipped to the U.S. from China during the housing boom following Hurricane Katrina. This drywall, now more commonly known as Chinese or Toxic Drywall, contained sulfur compounds. Toxic (Chinese) Drywall can release sulfur compounds believed responsible for damaging homes and causing health problems.
Primary physical health complaints from Toxic Drywall include the following:
- Moderate to severe eye, nose and throat irritation
- Respiratory tract infections, increased asthma symptoms
- Reoccurring headaches
- Insomnia and sleep apnea
Structural phenomenons that may be caused by Toxic Drywall include:
- Sparks, arcs, pops, sizzles or a buzzing noise from electrical outlets and appliances
- Lights that are unusually dim or flicker without cause
- Frequent circuit breaker trips without a known cause
- Pungent or foul odors often described as a rotten-egg-like odor
- Overheating of electrical components (plugs, switches, cords etc.)
- Blackening of copper (pipes, wires etc.)
Step I:

![]() |
| Oxidization of copper building materials due to the airborne presence of elemental sulfur. |
![]() |
Step II:
The second step is completed provided two of the three criteria in Step I is confirmed.
Method D5504-08 or similar chamber or headspace testing; (a total of three composite samples consisting of four sub-samples will be collected from each condominium)
Laboratory analysis is to be performed by a laboratory experienced in the analytical methods and procedures. Strontium is not to be used as an indicator of "Chinese Drywall"
Abatement Procedures
All drywall within the residence/building must be removed and replaced with new, as well as all the copper components which include wiring, piping and HVAC coils. All insulation and duct work must also be removed and replaced with new. After all of the above listed affected building are removed and prior to the installation of new building materials, the entire interior of the residence/building must undergo decontamination. The decontamination process consists of the removal of all residual drywall dust via HEPA vacuuming and a damp wipe down of all surfaces. Furthermore, RGI uses HEPA filtered air scrubbers remove all drywall dust suspended in the air. There is also an "air out" of the structure for a specified period (typically 3 to 4 weeks) to precede reconstruction. Structural components, metal studs, CPVC piping and other components are not affected and may remain in place.
Reporting and Abatement Documentation
A report is provided by a qualified independent third party to thoroughly document the assessment activities and the procedures utilized during completion of the work. The report is to contain a location map and site plot plan illustrating sample locations and a table with sample site descriptions. Include concisely captioned color photographs as relevant. Laboratory documentation, including qualifications, results of sample analysis, chain of custody, and laboratory QA/QC procedures, is to be included in the report. Work should be conducted by a state licensed professional; if that state has a licensing program. The report must be signed by a C.I.H., a State Licensed Inspector, or other qualified professional.